Fort Union Gas Gathering System Map
  • 106 miles, 24-inch high pressure gathering system with a maximum operating pressure of 1440 psig.
  • CO2 treating facility located at the southern end of the system.
  • Initial capacity of 435 MMcf per day, expanded to 1.25 Bcf per day.
  • Interconnections include CIG Powder River Lateral, WIC Medicine Bow Lateral, and Tallgrass Pipeline.